
Original: $3,867.53
-65%$3,867.53
$1,353.64The Story
The EHC Comet PV 14.4kW Electric Boiler & 200L Pre-Plumbed Cylinder Package (EHCEPV14.4/200PPC) combines the field-configurable Comet PV multi-output boiler with a factory pre-plumbed 200-litre Neptune Indirect Unvented Stainless Steel Cylinder. The cylinder arrives with its valves, wiring centre, and circulating pump pre-fitted, cutting on-site installation time versus a standard indirect cylinder, while the boiler's coil-heated indirect recovery still gives faster reheat than a Direct cylinder.
Qualified Installation Required
This boiler must be installed, commissioned, and electrically connected by a qualified electrician in accordance with BS7671. The unvented cylinder is a controlled service under Building Regulation G3 (England & Wales), Technical Standard P3 (Scotland), or Building Regulation Part F (Northern Ireland) and must only be fitted by a competent, G3-qualified installer. A magnetic filter must be fitted to the boiler — failure to do so will invalidate the manufacturer's warranty.
Pre-Plumbed for Faster Installation
The cylinder's automatic by-pass, wiring centre, combination valve, temperature and pressure relief valve, tundish, twin 2-port zone valves, filling loop, and high-efficiency circulating pump are pre-fitted and pre-wired at the factory. EHC estimate this can save up to 70% of installation time on the cylinder side compared with a standard (non pre-plumbed) indirect cylinder fitted with loose components.
Model-Specific Cylinder Performance Data Not Published
EHC's current documentation confirms this pre-plumbed cylinder's capacity (200L) and cased dimensions (1120mm height x 710mm diameter), but does not publish model-specific coil surface area, heat-up time, or weight figures for this exact SKU. Confirm these directly with EHC if required for a design calculation.
Field-Configurable Output
A single boiler chassis covers 7.2, 9.6, 12.0, or 14.4kW via an on-board DIP switch, so installers can right-size the heat output to the building's calculated heat loss without stocking multiple boiler models.
Pre-Wired Cylinder Controls
The cylinder's wiring centre, zone valves, and pump are pre-connected at the factory, reducing the electrical terminations an installer needs to make on site.
Faster DHW Recovery Than Direct
As an indirect cylinder heated via the boiler's primary coil, recovery is markedly quicker than an equivalent-size Direct (immersion-only) cylinder.
Weather Compensation
An outdoor temperature sensor (Tos) lets the boiler's controller adjust flow temperature to a selectable heating curve, reducing energy use during milder weather.
Automatic Anti-Legionella Cycle
A configurable disinfection routine raises cylinder temperature to a set point on a chosen day and time, addressing Legionella risk without manual intervention.
Backup Immersion Heating
The cylinder's 3kW Incoloy immersion element provides electric backup water heating independent of the boiler's primary circuit.
| Boiler — General | |
| Model / MPN | EHCEPV14.4/200PPC |
| Boiler range | Comet PV Model 2 (7.2 / 9.6 / 12.0 / 14.4kW, field-selectable) |
| Rated output (this package) | 14.4kW |
| Boiler dimensions (H x W x D) | 716 x 316 x 235mm |
| Boiler weight | ≈20.5kg |
| Boiler connections | G3/4" (inside thread) |
| Safety class | IP22 |
| Outlet flow temperature range | 20 – 85°C |
| Max. medium temperature | 100°C |
| Max. system pressure | 0.3MPa (3 bar) |
| Min. system pressure | 0.05MPa (0.5 bar) |
| Built-in expansion vessel | 5 litres, 1.5 bar pre-charge |
| Boiler — Electrical | |
| Rated voltage | 240V 1N~ (single phase) |
| MCB rating | 63A |
| Load current | 60.0A |
| Min. power supply cable c.s.a.* | 10mm² |
| Max. power supply cable c.s.a. | 16mm² |
| Max. allowed network impedance | 0.22Ω |
| RCD protection | 30mA Residual Current Device required on supply |
| Cylinder — 200L Pre-Plumbed Indirect | |
| Cylinder capacity | 200 litres |
| Cased height | 1120mm |
| Cased diameter | 710mm |
| Construction | Duplex stainless steel, TIG welded |
| Factory pressure test | 15 bar |
| Insulation | CFC- and HCFC-free polyurethane foam |
| Regulatory status | Controlled service – England & Wales Building Reg. G3 / Scotland Technical Standard P3 / N. Ireland Building Reg. Part F |
| Max. inlet mains water pressure | 12 bar |
| Operating pressure | 3.0 bar |
| Expansion vessel charge pressure | 3.0 bar |
| Expansion valve opening pressure | 6.0 bar |
| Max. operating pressure | 7.0 bar |
| T&P relief valve opening | 7.0 bar |
| Immersion element | 3kW, 240V, Incoloy |
| Pre-Plumbed Pack — Included Components | |
| Controls | Pre-wired wiring centre |
| Valves | Combination valve, twin 2-port zone valves |
| Safety | Temperature & pressure relief valve, tundish |
| Circulation | High-efficiency circulating pump |
| Fill/vent | Filling loop, automatic by-pass |
| Warranty | |
| Boiler warranty | 2 years parts & labour, subject to registration within 60 days and annual servicing |
| Cylinder warranty | 2 years parts & labour from commissioning, subject to registration |
| Stainless steel inner vessel | 25-year guarantee (domestic installations) |
*Minimum permitted cable size; actual installation cable size must be calculated by a qualified electrician per BS7671, accounting for cable type and installation method.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
The EHC Comet PV 14.4kW Electric Boiler & 200L Pre-Plumbed Cylinder Package (EHCEPV14.4/200PPC) combines the field-configurable Comet PV multi-output boiler with a factory pre-plumbed 200-litre Neptune Indirect Unvented Stainless Steel Cylinder. The cylinder arrives with its valves, wiring centre, and circulating pump pre-fitted, cutting on-site installation time versus a standard indirect cylinder, while the boiler's coil-heated indirect recovery still gives faster reheat than a Direct cylinder.
Qualified Installation Required
This boiler must be installed, commissioned, and electrically connected by a qualified electrician in accordance with BS7671. The unvented cylinder is a controlled service under Building Regulation G3 (England & Wales), Technical Standard P3 (Scotland), or Building Regulation Part F (Northern Ireland) and must only be fitted by a competent, G3-qualified installer. A magnetic filter must be fitted to the boiler — failure to do so will invalidate the manufacturer's warranty.
Pre-Plumbed for Faster Installation
The cylinder's automatic by-pass, wiring centre, combination valve, temperature and pressure relief valve, tundish, twin 2-port zone valves, filling loop, and high-efficiency circulating pump are pre-fitted and pre-wired at the factory. EHC estimate this can save up to 70% of installation time on the cylinder side compared with a standard (non pre-plumbed) indirect cylinder fitted with loose components.
Model-Specific Cylinder Performance Data Not Published
EHC's current documentation confirms this pre-plumbed cylinder's capacity (200L) and cased dimensions (1120mm height x 710mm diameter), but does not publish model-specific coil surface area, heat-up time, or weight figures for this exact SKU. Confirm these directly with EHC if required for a design calculation.
Field-Configurable Output
A single boiler chassis covers 7.2, 9.6, 12.0, or 14.4kW via an on-board DIP switch, so installers can right-size the heat output to the building's calculated heat loss without stocking multiple boiler models.
Pre-Wired Cylinder Controls
The cylinder's wiring centre, zone valves, and pump are pre-connected at the factory, reducing the electrical terminations an installer needs to make on site.
Faster DHW Recovery Than Direct
As an indirect cylinder heated via the boiler's primary coil, recovery is markedly quicker than an equivalent-size Direct (immersion-only) cylinder.
Weather Compensation
An outdoor temperature sensor (Tos) lets the boiler's controller adjust flow temperature to a selectable heating curve, reducing energy use during milder weather.
Automatic Anti-Legionella Cycle
A configurable disinfection routine raises cylinder temperature to a set point on a chosen day and time, addressing Legionella risk without manual intervention.
Backup Immersion Heating
The cylinder's 3kW Incoloy immersion element provides electric backup water heating independent of the boiler's primary circuit.
| Boiler — General | |
| Model / MPN | EHCEPV14.4/200PPC |
| Boiler range | Comet PV Model 2 (7.2 / 9.6 / 12.0 / 14.4kW, field-selectable) |
| Rated output (this package) | 14.4kW |
| Boiler dimensions (H x W x D) | 716 x 316 x 235mm |
| Boiler weight | ≈20.5kg |
| Boiler connections | G3/4" (inside thread) |
| Safety class | IP22 |
| Outlet flow temperature range | 20 – 85°C |
| Max. medium temperature | 100°C |
| Max. system pressure | 0.3MPa (3 bar) |
| Min. system pressure | 0.05MPa (0.5 bar) |
| Built-in expansion vessel | 5 litres, 1.5 bar pre-charge |
| Boiler — Electrical | |
| Rated voltage | 240V 1N~ (single phase) |
| MCB rating | 63A |
| Load current | 60.0A |
| Min. power supply cable c.s.a.* | 10mm² |
| Max. power supply cable c.s.a. | 16mm² |
| Max. allowed network impedance | 0.22Ω |
| RCD protection | 30mA Residual Current Device required on supply |
| Cylinder — 200L Pre-Plumbed Indirect | |
| Cylinder capacity | 200 litres |
| Cased height | 1120mm |
| Cased diameter | 710mm |
| Construction | Duplex stainless steel, TIG welded |
| Factory pressure test | 15 bar |
| Insulation | CFC- and HCFC-free polyurethane foam |
| Regulatory status | Controlled service – England & Wales Building Reg. G3 / Scotland Technical Standard P3 / N. Ireland Building Reg. Part F |
| Max. inlet mains water pressure | 12 bar |
| Operating pressure | 3.0 bar |
| Expansion vessel charge pressure | 3.0 bar |
| Expansion valve opening pressure | 6.0 bar |
| Max. operating pressure | 7.0 bar |
| T&P relief valve opening | 7.0 bar |
| Immersion element | 3kW, 240V, Incoloy |
| Pre-Plumbed Pack — Included Components | |
| Controls | Pre-wired wiring centre |
| Valves | Combination valve, twin 2-port zone valves |
| Safety | Temperature & pressure relief valve, tundish |
| Circulation | High-efficiency circulating pump |
| Fill/vent | Filling loop, automatic by-pass |
| Warranty | |
| Boiler warranty | 2 years parts & labour, subject to registration within 60 days and annual servicing |
| Cylinder warranty | 2 years parts & labour from commissioning, subject to registration |
| Stainless steel inner vessel | 25-year guarantee (domestic installations) |
*Minimum permitted cable size; actual installation cable size must be calculated by a qualified electrician per BS7671, accounting for cable type and installation method.






















